Four phases.
Zero surprises.

From site visit to handover — one engineer-in-charge owns the project throughout. No phase begins until the previous one is signed off.

Phase 01
Site Study
48 hours
Phase 02
Design
2 to 4 weeks
Phase 03
Install
14–21 days (stack & puzzle) · 35–45 days (automated tower)
Phase 04
Handover
3 days, then lifetime AMC
Phase 01

Site Study

48 hours

We come to your site — anywhere in India — and measure what is physically there. Footprint, basement clearance, ramp angles, column grids, soil conditions, electrical capacity. Within 48 hours of the visit, you receive a shortlisted system recommendation with indicative pricing.

What you receive
  • 01Measured site survey with sketches
  • 02System shortlist with capacity comparison
  • 03Indicative budget range (±15% accuracy)
  • 04Identification of structural and electrical constraints
  • 05Permit and code-compliance overview
There is no charge for Phase 01. It is how we begin every conversation.
Phase 02

Design

2 to 4 weeks

Once a system is selected and a letter of intent issued, our engineering team produces the full design package. Nothing gets fabricated until you have signed off on every drawing — and we do not bill for revisions during this phase.

Design package contents
  • 01General arrangement (GA) drawings
  • 02Foundation and embedment details
  • 03Hydraulic and pneumatic schematics
  • 04Electrical single-line and panel layouts
  • 05PLC I/O list and HMI screen design
  • 06Itemized bill of materials and final pricing
  • 07Coordination drawings for civil contractor and MEP teams
Phase 03

Install

14–21 days (stack & puzzle) · 35–45 days (automated tower)

Pre-fabricated steel skids, hydraulic power packs, motors and control panels are trucked to your site. Our crew handles erection, alignment, hydraulic charging, electrical termination, and commissioning.

On-site activities
  • 01Foundation verification and anchor setting
  • 02Structure erection and squaring
  • 03Hydraulic line installation and pressure test
  • 04Electrical termination and panel commissioning
  • 05PLC program load and sensor calibration
  • 06Dry-run and loaded test cycles
Phase 04

Handover

3 days, then lifetime AMC

Operator training, manuals, spares kit and warranty documents are handed over in a formal commissioning meeting. A one-year comprehensive warranty starts immediately. Most clients opt into our extended AMC packages.

Handover package
  • 01Operator training (2 sessions, 4 hours each)
  • 02Bilingual operation and safety manuals
  • 03Critical spares starter kit (2-year supply)
  • 041-year comprehensive warranty
  • 05AMC contract options (Silver, Gold, Platinum)
  • 0624/7 service-line access with on-call engineer roster
Every project ends with a documentation handover including manufacturing drawings, test certificates, operator manuals, spares catalogue and maintenance schedule — delivered both physically and digitally.

“Your facilities team can run and maintain the system completely, even if Space Park vanished tomorrow. We will not vanish — but you should never have to depend on us being there.”